Beschreibung
Artikel: | wine corkscew opener | Made in: | China |
Farbe: | Silber | Material: | zinc alloy/ stainless steel |
Größe: | original | Brauch: | accepted |
Gewicht: | 45 G | Probe Vorlaufzeit: | about 3-5days |
OEM: | accepted | Bulk goods lead time: | about 7-10days |
Investment Casting Parts
Material: Edelstahl, Carbon Steel
Verfahren: Lost wax casting
Standard:GBT6414-1999
Casting Tolerance: CT6 Standard
Gewicht: 0.1kg to 100kg
Product Range: Automotive, aviation, robot automation, machinery, tools, hardware, electronics, sanitary ware, pump valves, door locks and other stainless steel, Kohlenstoffstahl, alloy steel parts
Tooling made by ourself – Wir haben 2 CNC centers
Complete machining process – We have our own machining, Schweißen, Polieren, testing workshops
material components | ||||||
Chemical Composition of Material | Material
Composition |
201 | 202 | 304 | 316 | 430 |
C | ≤0.15 | ≤0.15 | ≤0.08 | ≤0.035 | ≤0.12 | |
Si | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | |
Mn | 5.5-7.5 | 7.5-10 | ≤2.00 | ≤2.00 | ≤1.00 | |
P | ≤0.06 | ≤0.06 | ≤0.045 | ≤0.045 | ≤0.040 | |
S | ≤0.03 | ≤0.03 | ≤0.030 | ≤0.030 | ≤0.030 | |
Cr | 13-15 | 14-17 | 18-20 | 16-18 | 16-18 | |
Ni | 0.7-1.1 | 3.5-4.5 | 8-10 | 10-12 | ||
Mo | 2.0-3.0 | |||||
Mechanical Property | Material Item | 201 | 202 | 304 | 316 | |
Tensile Strength | ≥535 | ≥520 | ≥520 | ≥520 | ||
Yield Strength | ≥245 | ≥205 | ≥205 | ≥205 | ||
Extension | ≥30% | ≥30% | ≥35% | ≥35% | ||
Härte (HV) | <105 | <100 | <90 | <90 |
Advantange
Unternehmensvorstellung
ABL was founded in 2008 by Kate Liang, started from a 400 square meters workshop.
In 2009, Supported by customers and suppliers, ABL moved to a 4000 Quadratmeter workshop and expand our business all over the world.
In 2012, We have sold our products to more than 200 Länder, and our brand existed
in more than 50 countries in the world.
In 2013, We have passed CUPC,NSF,CE and ROHS cetificate,starting entered into the European and American markets.
In 2014, with fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining equipments.
In 2015, We set up our management team. We have cooperated with some unversities and getting bigger. At the same time, we are also Alibaba training center.
Aus 2016 zu 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificate. we have already cooperated with some top 500 enterprises.
2018, ABL focus more on the Lean Production and preparing for the next five years.
2019, We are going to build a testing center and achieve the higher sales goal.
Fertigungsprozess
Steps | Zeit | |
Tooling Making | CNC Center | 7 Tage |
Casting Process |
Wax Injection | 2 Tage |
Sand Shell Molding | 5 Tage | |
Dewaxing | 1 Tage | |
Pouring | 1 Tage | |
Cutting | 1 Tage | |
Grinding | 1 Tage | |
Cleaning | 1 Tage | |
Machining Process |
CNC | 2 Tage |
Drilling & Tapping | 2 Tage | |
Welding | 2 Tage | |
Stempeln | 1 Tage | |
Polishing | 5 Tage | |
Assembling | Ultrasonic Washing | 1 Tage |
Water Testing | 1 Tage | |
Assembling | 2 Tage | |
Anmerkung: The production time base on standard quantity and process |
Unsere Aufgabe
To change the world’s view about Chinese product.
To be the leader in precision casting industry.
Our dream
- To gain Win-win achievement with all of our clients and supplies
- To be an international famous brand.
- To be a one-hundred-year company
After-sales Service
- Reply you fast within 12 Std..
- Have someone to follow up all your inquiry and order.
- We will offer satisfied quality and prices to you.
FAQ
Our factory located in Zhaoqing City, Guangdong Province. Fabrik 50000 square meters with 265 Arbeitskräfte.
We do T/T, 30% Kaution, balance before delivery. We can also accept L/C.
Casting part need 20 zu 30 Tage.
Balustrade and handrail accessories need 25 zu 35 Tage.
Faucet and shower need 40 zu 60 Tage.
Sicher, we sincerely welcome you to visit our factory, we can also pick you from the hotel.