Descrição
Item: | wine corkscew opener | Made in: | China |
Cor: | prata | Material: | zinc alloy/ stainless steel |
Tamanho: | original | Personalizado: | accepted |
Peso: | 45 g | Prazo de entrega da amostra: | about 3-5days |
OEM: | accepted | Bulk goods lead time: | about 7-10days |
Investment Casting Parts
Material: Aço inoxidável, Carbon Steel
Processo: Lost wax casting
Padrão:GBT6414-1999
Casting Tolerance: CT6 Standard
Peso: 0.1kg to 100kg
Product Range: Automotive, aviation, robot automation, machinery, tools, hardware, electronics, sanitary ware, pump valves, door locks and other stainless steel, carbon steel, alloy steel parts
Tooling made by ourself – Nós temos 2 CNC centers
Complete machining process – We have our own machining, Soldagem, polimento, testing workshops
material components | ||||||
Chemical Composition of Material | Material
Composition |
201 | 202 | 304 | 316 | 430 |
C | ≤0.15 | ≤0.15 | ≤0.08 | ≤0.035 | ≤0.12 | |
Si | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | |
Mn | 5.5-7.5 | 7.5-10 | ≤2.00 | ≤2.00 | ≤1.00 | |
P | ≤0.06 | ≤0.06 | ≤0.045 | ≤0.045 | ≤0.040 | |
S | ≤0.03 | ≤0.03 | ≤0.030 | ≤0.030 | ≤0.030 | |
Cr | 13-15 | 14-17 | 18-20 | 16-18 | 16-18 | |
Ni | 0.7-1.1 | 3.5-4.5 | 8-10 | 10-12 | ||
Mo | 2.0-3.0 | |||||
Mechanical Property | Material Item | 201 | 202 | 304 | 316 | |
Tensile Strength | ≥535 | ≥520 | ≥520 | ≥520 | ||
Yield Strength | ≥245 | ≥205 | ≥205 | ≥205 | ||
Extension | ≥30% | ≥30% | ≥35% | ≥35% | ||
Dureza (HV) | <105 | <100 | <90 | <90 |
Advantange
introdução da companhia
ABL was founded in 2008 by Kate Liang, started from a 400 square meters workshop.
Em 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world.
Em 2012, We have sold our products to more than 200 países, and our brand existed
in more than 50 countries in the world.
Em 2013, We have passed CUPC,NSF,CE and ROHS cetificate,starting entered into the European and American markets.
Em 2014, with fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining equipments.
Em 2015, We set up our management team. We have cooperated with some unversities and getting bigger. At the same time, we are also Alibaba training center.
From 2016 para 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificado. we have already cooperated with some top 500 enterprises.
2018, ABL focus more on the Lean Production and preparing for the next five years.
2019, We are going to build a testing center and achieve the higher sales goal.
Processo de produção
Steps | Tempo | |
Tooling Making | CNC Center | 7 dias |
Casting Process |
Wax Injection | 2 dias |
Sand Shell Molding | 5 dias | |
Dewaxing | 1 dias | |
Pouring | 1 dias | |
Cutting | 1 dias | |
Grinding | 1 dias | |
Cleaning | 1 dias | |
Machining Process |
CNC | 2 dias |
Drilling & Tapping | 2 dias | |
Welding | 2 dias | |
Estampagem | 1 dias | |
Polimento | 5 dias | |
Assembling | Ultrasonic Washing | 1 dias |
Water Testing | 1 dias | |
Assembling | 2 dias | |
Observação: The production time base on standard quantity and process |
Our mission
To change the world’s view about Chinese product.
To be the leader in precision casting industry.
Our dream
- To gain Win-win achievement with all of our clients and supplies
- To be an international famous brand.
- To be a one-hundred-year company
After-sales Service
- Reply you fast within 12 horas.
- Have someone to follow up all your inquiry and order.
- Ce will offer satisfied quality and prices to you.
Perguntas frequentes
Our factory located in Zhaoqing City, Província de Guangdong. Fábrica 50000 square meters with 265 trabalhadores.
We do T/T, 30% depósito, balance before delivery. We can also accept L/C.
Casting part need 20 para 30 dias.
Balustrade and handrail accessories need 25 para 35 dias.
Faucet and shower need 40 para 60 dias.
Claro, we sincerely welcome you to visit our factory, we can also pick you from the hotel.